- Weatherford Knowledge Base
- Packages
- PetroVisor Package
-
Getting Started
-
Customer Training
-
Customer Success
-
Updates
-
Production Optimization
-
Artificial Lift Optimization
-
Completion Optimization
-
Environmental, Social & Governance
-
Development, Acquisition & Divestitures
-
Enhanced Oil Recovery
-
Admin
-
P#
- Getting Started with P#
- Data Cleansing
- String Functions
- Scenario Functions
- Regression Functions
- Placeholder Functions
- Mathematical Functions
- Logic Functions
- Entities Function
- Moving Window Functions
- Time and Date Functions
- Statistical Functions
- Economic Functions
- Data Handling
- Additional Functions
- Directional Functions
- Machine Learning Functions
- DCA Functions
- Neighborhood Functions
-
Packages
Water Breakthrough Package
The Water Breakthrough package detects water breakthrough based on water cut threshold violations.
Usage
Run the workflows from this package to perform the calculations. The schedules may be adapted to use different contexts.
Details
This package creates tag entries for the following two tags:
- Water Cut Above Threshold: this tag is created as soon as the water cut exceeds the set threshold
- Water Breakthrough: this tag is created if the water cut exceeds the threshold for the configured number of consecutive days.
The threshold to check the water cut against is set as an independent signal for each entity. The number of consecutive days needed to trigger the Water Breakthrough tag creation is configured in the workflow.
Data Requirements
The following data is required on well level:
water cut
water cut upper threshold